About the Project
Client Name: City of Rockville
Utility Program: Pepco Building Tune-up
Project Size: 52,000 GSF
Scope of Work
- Occupancy Based HVAC Controls
- Reprogrammed Temperature Set Points (Occupied & Unoccupied)
- Optimized Minimum Outside Air Flow to meet ASHRAE Standards
- Eliminated Simultaneous Heating & Cooling
- Building Envelope Weatherization (Reduce Air Infiltration)
The Results
119,000 kWh estimated annual energy savings
