St. Johns Properties

About the Project

Client Name: St. Johns Properties

Utility Program: BGE Building Tune-up

Project Size: 98,000 GSF

Scope of Work

  • Discharge air temperature reset strategies
  • Optimize minimum DX compressor runtime to prevent cooling overshoot
  • Static pressure set point reset strategies
  • VAV box CFM set point adjustments and unoccupied zone schedule
  • Make-up and Exhaust fan interlock and scheduling
  • Repair and optimize lighting controls

The Results

279,000 kWh estimated annual energy savings