About the Project
Client Name: Commercial Green Solutions / Commonwealth Lodging
Project: Richmond Marriott Short Pump
Location: 4240 Dominion Boulevard | Glen Allen, VA 23060
Facility Type: Non-Residential Building Optimization
Project Size: 189,000 SF
Project Completion: May 2023
ECM Cost and Savings Summary
$12,064.92
Total Dominion Rebate
190,733 kWh
Annual Energy Savings
$22,888.00
Annual Electric Cost Savings
<7 months
Payback Period (ROI)
About the Project
As a pre-approved Retro-Commissioning provider through Dominion’s Non-Residential Office and Non-ResidentialBuilding Optimization programs, HBS Solutions was able to provide a turnkey approach that identified, evaluated,quantified, implemented, and verified Energy Conservation Measures (ECMs). The ECMs included in this engagementprovided improved operational efficiency and resulted in quick returns on investment. Particular attention was focusedon low-cost and operational driven savings as core strategies to energy conservation.
The Non-Residential Office and Non-Residential Building Optimization process involves five phases: detailed investigation phase including a Level I & II ASHRAE energy audit, preliminary energy study and calculations, implementation of the ECMs, final energy study and calculations, and verification phase. Financial incentives are provided through the Dominion programs which cover up to 75% of the total project costs.
The Results
ECMs Implemented:
- Optimized HVAC equipment operating schedules.
- Eliminated simultaneous heating and cooling.
- Increased chiller supply occupied set points.
- Calibrated chiller temperature set point sensors and optimized chiller temperature scale.
- Optimized VAV unoccupied set points.